How we work

We stay on the project from the first call to the last site review, so nothing gets lost between the drawings and the site.

Four steps, first call to site review

  1. 01Day 1

    Call or email

    Send the address and a few lines about the project. We answer most first questions on that call.

  2. 02Week 1

    Concept design

    We set out the structural system and the main member sizes, so you can plan and price before detailed design.

  3. 03Weeks 2–4

    Design and permit

    We prepare calculations and sealed drawings in-house, ready for your building permit.

  4. 04Construction

    Site review

    We check footings, framing and steel against the drawings and issue a letter after each review.

What we check on site

Footings
Footings
Framing
Framing
Steel
Steel

What you receive

We design and detail light wood, mass timber, concrete and steel structures. You get permit-ready sealed drawings.

  • Permit-ready sealed drawings
  • A letter after each site review
  • Final Schedule C-2 (residential)